翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

S1 (Vienna S-Bahn) : ウィキペディア英語版
S1 (Vienna)

S1 of the Vienna S-Bahn is an electrified commuter rail service operating between Gänserndorf and Mödling with extended service to Wiener Neustadt in the greater Vienna area. The S1 opened on 17 January 1962 and is the oldest S-Bahn service in Austria.
==History==
The first plan for the Vienna S-Bahn was drafted in 1954, however due to World War II, the tracks around Vienna were badly damaged. The Federal railways invested heavily in this project as Vienna's railway infrastructure was basically reconstructed. A trunk line connecting the northern railway with the southern railway was built through the city center. On 31 May 1959, the northern railway bridge was reopened allowing rail traffic from Floridsdorf to enter the city to Praterstern. In the beginning of 1960, a second track was added to the trunk line in anticipation of the new traffic however, in the same year, a funding crisis temporarily halted construction and delayed opening by more than a year. On 8 January 1962 the first trail runs were made by two 4061 class electric locomotives and on 17 January 1962, the S-Bahn officially opened. A big ceremony was held at South station as the inaugural train departed to Gänserndorf. Austrian president Adolf Scharf, Vice Chancellor Bruno Pittermann, Mayor Franz Jonas, ÖBB president Maximilian Schantl and Transport Minister Karl Waldbrunner took part in the ceremony along with over 900 invited guests. Revenue service started at 23:45 that evening.〔Eisenbahn 1962/3 S. 66〕
The S-Bahn was an instant success. Many trains were overcrowded through the city center paving way for an agreement with VOR, the regional public transport company, allowing passengers to use city trams and S-Bahn trains with the same ticket. Service frequency was originally every hour but due to heavy ridership, frequency was increased to every half-hour on 28 May 1967. The tracks north of the Danube were renovated in 1972. In 1977 a park-and-ride facility was opened in Gänserndorf. Shortly after several more facilities were opened in other stations. On 23 May 1982 frequency was increased to Leopoldau to every 15 minutes in anticipation of the opening of the S2 line. Two new stations; Süßenbrunn and Helmahof were opened in 1980 and 1984 respectively. When the U1 line of the Vienna U-Bahn was completed to Leopoldau, a connection was built from the U-Bahn station to the S-Bahn station.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「S1 (Vienna)」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.